HVDC link connected to two infinite buses
This test case works with Modelica
Standard Library 3.2.3.
This test case consists in one
HVDC link connected to two infinite buses. A short-circuit at the
HVDC link terminal 2 is simulated at t = 8 s and cleared at t = 9
s.
Generated at 2026-04-15T18:18:36Z by OpenModelicaOpenModelica 1.26.3 using
GenerateDoc.mos