Plant in both scheduled and Primary and Secondary Control operation
1. Purpose of model
Plant in both scheduled Primary and Secondary Control
operation.
2. Level of detail, physical
effects considered, and physical insight
L1 (defined in the CodingConventions) - only active power and
frequency.
3. Limits of validity
(no remarks)
4. Interfaces
(no remarks)
5. Nomenclature
(no remarks)
6. Governing Equations
(no remarks)
7. Remarks for Usage
(no remarks)
8. Validation
(no remarks)
9. References
(no remarks)
10. Version History
Model created by Pascal Dubucq (dubucq@tuhh.de) on 01.10.2014
Quality check (Code
conventions) by Rebekka Denninger on 01.10.2016
Generated at 2026-04-15T18:18:36Z by OpenModelicaOpenModelica 1.26.3 using
GenerateDoc.mos