- May 13, 2021, by Michael Wetter:
Changed boundary condition model to prescribed pressure rather than
prescribed mass flow rate. Prescribing the mass flow rate caused
unreasonably large pressure drop because the mass flow rate was
forced through a closed valve.
This is for #2488.
- September 11, 2017, by Michael Wetter:
Corrected wrong use of replaceable model.
This is for issue
921.
- June 25, 2017, by Yangyang Fu:
First implementation.