This sequence checks if there is setpoint change and if the time-based suppression has finished. The implementation is according to the Section 5.1.20 of ASHRAE Guideline 36, May 2020.
Calculate a time-delay period after any change in setpoint based on the difference between the controlled variable at the time of the change and the new setpoint. The default time delay period shall be as follows:
chaRat) but no longer
than 120 minutes (1800).chaRat) but no
longer than 30 minutes (1800).chaRat) but no
longer than 30 minutes (1800).hold with pre to break the
algebraic loop involving the latch component. This is for issue
3883.